Previous Project Experience Includes but not limited to:
- • SAFETY IMPROVEMENT PROJECTS
- • SCRAP AND DEFECT REDUCTION
- • REWORK REDUCTION
- • ON TIME PERFORMANCE IMPROVEMENT
- • CYCLE TIME REDUCTION
- • FLOW OPTIMIZATION
- • CHANGEOVER REDUCTION
- • SPC IMPLEMENTATION (STATISTICAL PROCESS CONTROL)
- • DOWNTIME REDUCTION
- • FMEA
- • POKA-YOKE
- • BOTTLENECK REDUCTION
- • PREVENTATIVE MAINTENANCE
- • ERGONOMIC SOLUTIONS
- • PROCESS OPTIMIZATION
- • MACHINE MONITORING/DATA COLLECTION/OEE
- • SCHEDULING OPTIMIZATION
- • MEASUREMENT SYSTEM IMPROVEMENT
- • STANDARDIZING FOR PREDICTABLE RESULTS
- • LINE LAYOUT
- • PREMIUM FREIGHT REDUCTION
- • WIP REDUCTION (WORK IN PROGRESS)
- • MATERIAL USAGE OPTIMIZATION
- • TOOL LIFE/CUTTING FLUID OPTIMIZATION
- • PRODUCT OUTSOURCING/INSOURCING
- • LEAD TIME TO CUSTOMER REDUCTION
- • NEW PRODUCT DEVELOPMENT OPTIMIZATION
- • OVER PRODUCTION
- • 5S PROJECTS
- • PRODUCT CAPABILITY
- • MACHINING PROGRAM OPTIMIZATION
- • FINAL INSPECTION PROCESS IMPROVEMENT
- • ONE PIECE FLOW ON AN ASSEMBLY LINE
- • MATERIAL RECLAMATION
- • ASSEMBLY PROCESS OPTIMIZATION
- • PLATING LINE IMPROVEMENTS
- • PAINT LINE IMPROVEMENTS
- • DOE (DESIGN OF EXPERIMENTS)
- • EMPLOYEE TURNOVER REDUCTION
- • EXCESSIVE INVENTORY REDUCTION
- • PURCHASING OPTIMIZATION
- • CUSTOMER COMPLIANCE PROJECTS
- • TRAINING IMPROVEMENTS
- • ASSEMBLY/MATERIAL COMPONENT SHORTAGES
- • OPTIMIZATION TO REDUCE OVER PROCESSING
- • OPTIMUM PART NESTING
- • OUTSIDE OF LEAD TIME ORDER REDUCTION
- • HANDLING/STORAGE DAMAGE REDUCTION
- • CONTAMINATION REDUCTION